St Columb housing development – progress on site

Studio arc were instructed by DCH to design a scheme to provide 47 dwellings in St Columb. Kier began on site autumn 2015 and the development is quickly progressing, due to complete early August 2016.

IMAG2324_small
IMAG2327_smallIMAG2329_small
IMAG2335_small

Share this post

Share on facebook
Share on twitter
Share on linkedin
Share on email
© Copyright Studio ARC / All rights reserved.

Pricacy Policy / Cookie Policy / Terms & Conditions

Pricacy Policy / Cookie Policy / Terms & Conditions
© Copyright Studio ARC / All rights reserved.

error: This image is not available for download